Franklin Police Headquarters

This project involves a replacement headquarters for the Franklin Police Department. Containing approximately 94,000 square feet, the building includes a 911 Emergency Operations Center, suspect processing, I.D. Lab, Vehicle Examination, Evidence Holding, and a 2-story parking deck. A high-efficiency, ground-coupled Geothermal HVAC system is incorporated in the physical plant. The geothermal borefield system is approximately 200 tons, consisting of eight (8) independent water loops. Each of the eight loops is composed of thirteen (13) 500 foot deep grout-filled, U-loop bores. This project has been certified as a LEED Gold Building.

Read More

Highland Heights School

This project involves the renovation of and addition to the Highland Heights School in Nashville, Tennessee. The subject structure is a historical building, originally built in 1930. The 101,000 square foot building was renovated and updated to provide educational and recreational space for 900 students. Of particular note is the HVAC system which utilizes a Geothermal Earth-coupled system.

Read More

Nashville State Community College – Southeast Campus

This project is a 150,000 square foot renovation to create the Antioch Campus of Nashville State. The building consists of office space, classrooms, teaching laboratories and a teaching kitchen. Project also included the retrofit of the existing chilled water plant.

Read More

Nashville Fire Department Station 33

This project consists of a multi-story building containing approximately 20,000 square feet. The building includes high-efficiency, variable refrigerant flow (VRF), HVAC system with supporting heat recovery ventilation air systems, electric vehicle charging stations, roof mounted solar systems, and LED site lighting. This building was submitted to USGBC for consideration and achieved a LEED Gold rating.

Read More

Nashville Fire Department Station 31

This project consists of a multi-story building containing approximately 20,000 square feet. The building includes high-efficiency, variable refrigerant flow (VRF), HVAC system with supporting heat recovery ventilation air systems, electric vehicle charging stations, roof mounted solar systems, and LED site lighting. This building was submitted to USGBC for consideration and achieved a LEED Gold rating.

Read More