Tennessee
Featured Projects
Franklin Police Headquarters
This project involves a replacement headquarters for the Franklin Police Department. Containing approximately 94,000 square feet, the building includes a 911 Emergency Operations Center, suspect processing, I.D. Lab, Vehicle Examination, Evidence Holding, and a 2-story parking deck. A high-efficiency, ground-coupled Geothermal HVAC system is incorporated in the physical plant. The geothermal borefield system is approximately 200 tons, consisting of eight (8) independent water loops. Each of the eight loops is composed of thirteen (13) 500 foot deep grout-filled, U-loop bores. This project has been certified as a LEED Gold Building.
Read MoreNashville State Community College Administration and Support Building
This project involved the construction of a new 73,000 square foot building located on the main campus of Nashville State Community College. Spread over three floors, this square footage added theater, support space, and classrooms to the campus.
Read MoreHighland Heights School
This project involves the renovation of and addition to the Highland Heights School in Nashville, Tennessee. The subject structure is a historical building, originally built in 1930. The 101,000 square foot building was renovated and updated to provide educational and recreational space for 900 students. Of particular note is the HVAC system which utilizes a Geothermal Earth-coupled system.
Read MoreNashville State Community College – Southeast Campus
This project is a 150,000 square foot renovation to create the Antioch Campus of Nashville State. The building consists of office space, classrooms, teaching laboratories and a teaching kitchen. Project also included the retrofit of the existing chilled water plant.
Read MoreVanderbilt Health at One Hundred Oaks
The repurposing of a 450,000 square foot mall to provide an extremely user-friendly and convenient health center.
Read MoreNashville Fire Department Station 33
This project consists of a multi-story building containing approximately 20,000 square feet. The building includes high-efficiency, variable refrigerant flow (VRF), HVAC system with supporting heat recovery ventilation air systems, electric vehicle charging stations, roof mounted solar systems, and LED site lighting. This building was submitted to USGBC for consideration and achieved a LEED Gold rating.
Read MoreMore Tennessee Projects
Tennessee College of Applied Technology – Dickson
This project involved the construction of a 12,000 sf building containing classrooms, nursing laboratories, offices, and support spaces.
Read MoreMetropolitan Nashville Police Department Supply and Records Building
The project includes the renovation of approximately 1,600 square feet of the existing Stem Cell Processing laboratory. The renovation of the laboratory incorporates the specific needs of a GTP processing lab, and creates an open working environment to facilitate flexibility and interaction between lab-techs. The program includes a new wet-lab space with modular casework, a tech lab, office, entry, as well as a larger and more efficient cryo-storage room.
Read MoreVanderbilt University Math Building Renovation
The project includes the renovation of approximately 1,600 square feet of the existing Stem Cell Processing laboratory. The renovation of the laboratory incorporates the specific needs of a GTP processing lab, and creates an open working environment to facilitate flexibility and interaction between lab-techs. The program includes a new wet-lab space with modular casework, a tech lab, office, entry, as well as a larger and more efficient cryo-storage room.
Read More